Submittal Tool

Watson Bowman Acme’s Bridge and Highway team is having a strong year, and the results keep coming in. Ken Heuff, Canadian Regional Sales Manager for Bridge and Highway Products, recently won a large project at Manitoba Hydro, the electric power and natural gas utility in Manitoba, Canada.

Dubbed ‘Manitoba Hydro Intake and Tailrace', the project scope is far reaching and encompasses the replacement of expansion joints in three Manitoba Hydro dams in Northern Manitoba, Kelsey, Kettle and Long Spruce Dams.

WBA worked very closely with the engineer, Hatch Engineering, to develop the best possible solutions to meet the needs of the projects. To address water-tightness and movement requirements on these critical structures, WBA is supplying 275 meters (902 feet) of Wabo®Crete StripSeal joints and 2400 meters (7874 feet) of Wabo®FS Bridge Seal. Joints are being installed by Western Construction Services.